QIS was contracted by TPSK to carry out the Torsional Vibration Analysis for 10-C-1100, 10- C-1200, 10-C-1300, 10-C-1400, 10-C-1500, 10-C-1600 Induced Draft Fan of 132U Furnace, A1 Package, Long Son Petrochemical Plant.
This project scope aims to define the actual dynamic torque behavior of the shaft covering all operating speeds and execute the fine tune the VFD control setting with VFD specialist.